Stainless Steel Seamless & Welded Pipes / Tubes – Process Inspection Plan: incoming raw material, stage-wise inspection, testing, traceability, packing & delivery.
| Sr. No. | Process Description | Ref. Documents / Standards | Characteristic to be Checked | Sampling / Inspection Frequency | Instrument / Equipment Used for Testing | Acceptance Criteria |
|---|---|---|---|---|---|---|
| 1 | S.S. Coils / Seamless Pipe (Mother Hollow) | Purchase Order / Specification |
• Dimensions • T.C. Verification (Lab Test Report), if required • Packing Condition • Weight • Defects, if any |
Sample / Heat | Vernier Caliper, Micrometer, Chemical Analysis, Tensile Testing Machine, Brinell / Rockwell Hardness Testing Machine | Conform to Specification – 100% |
| Sr. No. | Process Description | Ref. Documents / Standards | Characteristic to be Checked | Sampling / Inspection Frequency | Instrument / Equipment Used for Testing | Acceptance Criteria |
|---|---|---|---|---|---|---|
| 2 |
I. Welded Tube Forming & Welding II. Seamless Cold Drawing |
As per Work Order / Specification |
Dimensional check: Diameter (Ovality) x Length x Thickness • Weight • Defects, if any |
3 Samples from each Coil 1 Sample from each Lot |
Universal Testing Machine UIN 40-T, Make “UTS”; Microscope, Vernier Caliper, Micrometer & Measuring Tape |
Dimensions acceptable as per order Conform to standard / approved samples as per details |
| 3 | Annealing | Temperature as per ASTM Standard |
• Temperature • Hardness • Cooling • Water Quenching |
1 Sample per Lot / 1 Sample per Heat | Digital Graphic Temperature Recorder, Digital Temperature Indicator & Temperature Controller, Metallurgical Microscope, Brinell / Rockwell Hardness Tester | |
| 4 | Straightening | Straightening as per Specification | Check straightness of Pipes & Tubes | First 2 Pipes of each Size / Lot | Roller Straightening Machine, Micrometer, Visual Observation | Straightening as per Specification / Standard Sample |
| 5 | End Facing, Squaring & Beveling | Burr-Free Squaring / Beveling with Proper V-Shape | 100% Visual Inspection | Abrasive Polishing as per Standard Sample | Conform to Specification / Requirement | Straightening as per Specification |
| 6 | Hydrostatic Testing | As per ASTM Standard | Leakage | 100% | Hydraulic Pressure Tester | No Leakage |
| 7 | Pickling | As per applicable ASTM Standard / Requirement |
• Scale removal from inside surface • Scale removal from outside surface |
100% | Visual Observation | Conform to Requirement |
| 8 | Final Inspection – Physical / Chemical Testing | As per Applicable Standard | Visual, Dimensional, Physical & Chemical | 100% or as per ASTM Standard | Micrometer, Vernier Caliper, Universal Testing Machine, Moly Detector & Carbon Sampling at Random, Spectro / Wet Method | Conform to Requirement |
| 9 | Marking as per Customer Requirement / Standard | As per Requirement |
• Spelling Check • Details Verification |
100% – Confirm on first two Samples & continue | Inkjet Machine / Electro-Etching; correlation of Heat No., Size, Grade, etc. with Test Certificate | Conform to Requirement |
| 10 | Packing & Delivery | As per Customer Requirement | Packing Quality / Tightness of Packing | 100% – Conform to Requirement and release for delivery | Box / Crate, Polythene, Hessian Cloth | Packing conforms to Customer Requirement |
Copyright © 2026 MBM TUBES. All rights reserved. | Disclaimer | Blogs
Design & Promoted by www.rathinfotech.com